巜出轨上司的人妻3|巜被社长侵犯的人2中文在线|巜被蹂躏的奶水2在线播放|巨茎挺进李淑芬的体内|巨大茎挺进少妇杨雨婷|久久做受WWW

您好,歡迎訪問至臻和泰智能裝備(成都)有限公司的網(wǎng)站!

成都和泰升降機(jī)械有限公司

成都和泰升降機(jī)械有限公司
豐富的升降機(jī)設(shè)備生產(chǎn)經(jīng)驗(yàn)
為您提供用心的升降機(jī)全套解決方案
分類導(dǎo)航CLASSIFIED NAVIGATION
聯(lián)系和泰機(jī)械 / Contact us
聯(lián)系和泰機(jī)械

成都和泰升降機(jī)械有限公司

客戶統(tǒng)一咨詢熱線

189-0831-8192

郵箱:jnhetai@163.com

地址:成都市經(jīng)濟(jì)技術(shù)開發(fā)區(qū)成龍大道一段177號(hào)

當(dāng)前位置:  >  新聞資訊

影響升降平臺(tái)升降速度的因素有哪些?

文章來源:www.dyolme.com   發(fā)布時(shí)間:2023-01-04 14:17:53   瀏覽次數(shù):512

返回:新聞資訊

升降平臺(tái)是通過動(dòng)力單元帶動(dòng)液壓油產(chǎn)生壓力,使油缸活塞往復(fù)運(yùn)動(dòng)而帶動(dòng)液壓升降平臺(tái)臺(tái)面升降,升降平臺(tái)的升降速度是可以調(diào)整的,下面筆者為您講解一下。Zhejiang lift platform is through the power unit to drive the hydraulic oil pressure, the piston of the cylinder reciprocating movement and drives the hydraulic lifting platform lifting platform, Zhejiang lifting platform lifting speed can be adjusted, the author explain to you.

1.動(dòng)力單元調(diào)節(jié),升降平臺(tái)是由動(dòng)力單元和油缸控制的,動(dòng)力單元在生產(chǎn)時(shí)設(shè)有四個(gè)出孔,是可以調(diào)節(jié)大小的,增大或減小油缸液壓油流量,我們可以通過調(diào)整馬達(dá)速度或電液比例閥來調(diào)整液壓油流量。The power unit adjustment, Zhejiang lifting platform is composed of a power unit and a control cylinder, power unit is provided with four holes in the production, can be adjusted to increase or decrease the size of the hydraulic oil flow, we can adjust the hydraulic oil flow by adjusting the motor speed or electro-hydraulic proportional valve.

2.油管控制,液壓油管越長(zhǎng),上升時(shí)間也就越長(zhǎng)。因此在升降平臺(tái)安裝時(shí),在設(shè)計(jì)允許范圍內(nèi)要盡可能的減小油管的長(zhǎng)度;在調(diào)節(jié)動(dòng)力單元的基礎(chǔ)上也可以對(duì)輸油管路大小進(jìn)行調(diào)整,在保證設(shè)備達(dá)到正常需求安全的前提下,可以進(jìn)行相應(yīng)的調(diào)整。The longer the tubing, the longer the rise time. Therefore, the installation of lifting platform in Zhejiang, within the range of allowable design to minimize the length of tubing; based on the regulation of the power unit can also adjust the size of the oil pipeline, under the premise of ensuring safety of equipment to achieve the normal demand, can be adjusted accordingly.

3.油缸控制,油缸尺寸,在滿足設(shè)計(jì)要求的情況下,盡可能的減小油缸尺寸。升降平臺(tái)油缸尺寸越小,上升速度越快。Cylinder control, cylinder size, to meet the design requirements, as far as possible to reduce the size of the cylinder. The smaller the size of the cylinder, the faster the rising speed of the lifting platform in Zhejiang.

4.貨物的載量,升降平臺(tái)一次運(yùn)送貨物的噸位也影響升降的速度,達(dá)到升降臺(tái)運(yùn)送貨物的最佳值是速度的保障,如果偏重就影響到了速度,如果貨物太輕,也影響到了正常運(yùn)送時(shí)間。Load the cargo tonnage, Zhejiang a cargo lifting platform also affects the lifting speed, to lift the delivery of goods the best value is the speed of the security, if imbalance will affect the speed, if the goods are too light, will affect the normal delivery time.

推薦資訊 / Recommended news
  • 升降平臺(tái)電器保護(hù)系統(tǒng)升降平臺(tái)電器保護(hù)系統(tǒng)

    升降平臺(tái)是日常生活中最常用升降機(jī)設(shè)備,但由于實(shí)用的頻率頻繁就造成了石家莊升降平臺(tái)的磨損,那我們?cè)撊绾螌?duì)石家莊升降平臺(tái)進(jìn)行保護(hù)呢? 1、升降平臺(tái)必須在各操作位置設(shè)置方便操作的緊急斷電開關(guān),在緊急情況下,應(yīng)能切斷升降平臺(tái)總電源,緊急斷電開關(guān)應(yīng)...

    TIME:2023-01-04